03.17.2020
Installed: baseboard, doors, countertops, smoke detectors, stove, closet doors,
03.13.2020
03.10.2020
Garage Interior Painted, Doors in Garage Painted, Lights in bedrooms installed, Front door painted, tile flooring in the master bathroom.
03.05.2020 
   Vinyl Planking Down
   Kitchen cabinets Installed
   Back Fence Up
02.28.2020 Below
02/28/2020 Images
   New Paint in Home
   Water heater In garage not yet Installed
   Interior doors in the garage, not yet Installed
   Fence material in garage stacked in the garage.
02/21.2020  Exterior
   Front Shrubs are Removed
   Drywall work with ceilings knocked down.
   Garage Door Up with Opener
   Closets between Master and Bedroom have been closed off
02/21/2020 Interior
02.14.2020
02.12.2020